The reconstruction of the road which leads from the intersection at Trnovac cemetery towards the main entrance of the University Clinical Center Tuzla, in a length of 150 meters, has started recently. The road reconstruction is expected to create the conditions for better, faster and safer traffic communication for patients and employees.
The current reconstruction plan is of the utmost importance for Clinical Center Tuzla, and the works will be carried out in two phases. The first phase involves preparatory works, removal of existing asphalt, embankment construction, road drainage system solving and pavement repairing. The road asphalting, as well as vertical and horizontal signaling are to be carried out during the second phase.